Trade on the New York Stock Exchange was (1) ______ to a standstill on an autumn day (2) ______ 1994. The culprit for the outage (3) ______ a squirrel that had chewed through a power line near the computer center of the (4) ______ in Trumbull, Connecticut. The shutdown (5) ______ lasted for half-an-hour, resulted in the NYSE operating at 85 percent capacity.