Cloze Test MCQs for Competitive Examination

In the following passage some words have been deleted. Fill in the blanks with the help of the alternatives given. Select the most appropriate option for each blank.

Trade on the New York Stock Exchange was (1) ______ to a standstill on an autumn day (2) ______ 1994. The culprit for the outage (3) ______ a squirrel that had chewed through a power line near the computer center of the (4) ______ in Trumbull, Connecticut. The shutdown (5) ______ lasted for half-an-hour, resulted in the NYSE operating at 85 percent capacity.

Q. 1
(A) Worked
(B) Happened
(C) Taken
(D) Brought

Answer: (D) Brought

Trade on the New York Stock Exchange was (1) ______ to a standstill on an autumn day (2) ______ 1994. The culprit for the outage (3) ______ a squirrel that had chewed through a power line near the computer center of the (4) ______ in Trumbull, Connecticut. The shutdown (5) ______ lasted for half-an-hour, resulted in the NYSE operating at 85 percent capacity.

Q. 2
(A) In
(B) By
(C) At
(D) On

Answer: (A) In

Trade on the New York Stock Exchange was (1) ______ to a standstill on an autumn day (2) ______ 1994. The culprit for the outage (3) ______ a squirrel that had chewed through a power line near the computer center of the (4) ______ in Trumbull, Connecticut. The shutdown (5) ______ lasted for half-an-hour, resulted in the NYSE operating at 85 percent capacity.

Q. 3
(A) Is
(B) Were
(C) Was
(D) Has

Answer: (C) Was

Trade on the New York Stock Exchange was (1) ______ to a standstill on an autumn day (2) ______ 1994. The culprit for the outage (3) ______ a squirrel that had chewed through a power line near the computer center of the (4) ______ in Trumbull, Connecticut. The shutdown (5) ______ lasted for half-an-hour, resulted in the NYSE operating at 85 percent capacity.

Q. 4
(A) Town
(B) Store
(C) Exchange
(D) Bank

Answer: (C) Exchange

Trade on the New York Stock Exchange was (1) ______ to a standstill on an autumn day (2) ______ 1994. The culprit for the outage (3) ______ a squirrel that had chewed through a power line near the computer center of the (4) ______ in Trumbull, Connecticut. The shutdown (5) ______ lasted for half-an-hour, resulted in the NYSE operating at 85 percent capacity.

Q. 5
(A) Which
(B) What
(C) Who
(D) Whom

Answer: (A) Which

Share on facebook
Share on twitter
Share on linkedin
Share on pinterest
Share on reddit
Share on whatsapp
Share on email
Share on telegram